(Completed): IAD01 (Reston) Preventative Generator Maintenance 29-DEC-2011
EVENT START DATE: 12-29-2011
EVENT START TIME: 08:00 EST
EVENT END DATE: 12-30-2011
EVENT END TIME: 16:00 EST
EVENT IMPACT: IAD01 (Reston)
EVENT DETAILS:
CoreSite will be performing preventative generator maintenance that will check fluid levels, allow for a visual inspection, and will require the site load to be transferred to emergency for a minimum of 15 minutes to verify proper engine operation. This Preventative Maintenance will be conducted by the generator vendor.
Best practice and procedures will be employed throughout this event and we would like to ensure that all relevant IDC tenants are aware of the activity. If there are any questions regarding this maintenance, please open a support request via Pentagon (https://pentagon.layeredtech.com).